Project in progress
2010 évi projektjeink
Baumit Bukarest
Construction of a 57 metres tall sand processing tower, a 37 metres tall natural stone building, 1130 t steel structure and 800 t technological structure.
Baumit Bulgaria, expansion
Technological expansion of a Baumit tower previously built by KÉSZ Group.
Baumit Bulgaria, steel structure
Assembly of a 30 metres tall 90 t burn accelerator steel structure.
Baumit, Czech Republic
Expansion of an existing Baumit tower. Building in a 90 t steel structure and construction of a 45 metres long, 60 t silo.
Burger house, Szeged
Mechanical and electric assembly works in a scheduled building in the city center of Szeged.
Császár-Komjádi Swimming Pool, Budapest
The reconstruction of Császár-Komjádi Swimming Pool in Budapest.
Ferihegy Terminal 2, Sky Court
Reconstruction and development works at Budapest Airport Terminal 2A and 2B. The tasks of our company include preparing the construction plans of the continually operating airport, the demolition and reconstrucion of the existing buildings (Terminal 2A and 2B) and the general construction of the buildings in the airport's monitoring and commercial area, Sky Court.
Hotel City Inn
Reconstruction and expansion of a hotel in the city centre of Budapest with 71 rooms. The project includes the construction of a new wing to the building.
Kraft Foods - Ukraine
A Kraft ukrajnai leányvállalatunkat a KÉSZ UA-t választotta ki új gyáregységük felépítésére az ukrajnai Trostianetsben. A megbízás egy 15 000 m2-es kekszgyártó-üzem generál kivitelezésére és a kiviteli tervek elkészítésére szól. A projekt kezdőidőpontja előreláthatólag 2010. júliusa, a várható befejezés 2011 március.
LINEA Hall, Győr
General construction of a 2800 sqare metre hall with warehouses, a workshop hall and a social block.
MBMH Central Office Building
Construction of a 15 000 m2 office building at the industrial site of Daimler-Mercedes in Kecskemét. The office building is the central building of the industrial park.
MBMH ELT Building, Mercedes Kecskemét
Construction of an Electric Distributor Center at the industrial site of Mercedes in Kecskemét. The area of the electric distributor center is 1500 m2.
MBMH Lacquering Plant
Construction of a Lacquering Plant and Bodywork Warehouse at the industrial site of Daimler-Mercedes in Kecskemét on a 30 000 m2 construction area. The 4500 t heavy steel structure is manufactured by KÉSZ Industrial Manufacturer Ltd.
Nostra Cement, Királyegyháza
Technological assembly of a storage hall of a cement factory and the supplier line belonging to it (approximately 3400 t steel structure). 40-50 people work at the assembly.
Regional Integrated Vocational Training Centre
Reconstruction of a secondary school in the 11th district of Budapest. The right wing of the school is the building of the Regional Integrated Vocational Training Centre of the South-Buda area. Our task is the interior reconstruction of the building, mainly electrical and mechanical works.
University of Szeged, Department of Architecture
General construction of the University of Szeged Department of Architecture using 'Best Available Techniques'. An education building with a total floorspace of 3500 m2.
Vinnytsia Sweet Factory
KESZ UA - our subsidiary in Ukraine - has signed a contract with Vinnytsia Sweet Factory (Roshen) to the general execution of a chocolate factory that will be built as a greenfield investment. The site of the execution is Vinnytsia, 300 km-s away from Kiev. Our task is to build an alltogether 60 000 m2 large establishment, which includes a production hall, a five-storey office building and other service buildings.
Waste Management Plant, Ajka
Construction works of a hall with 1000 m2 floorspace. The steel structure was manufactured by KÉSZ Industrial Manufacturer Ltd. The tasks include the assembly of the steel structure, skinning of the roof and face works.
Waste Management Plant, Kerepes
Expansion of a waste management plant near Gödöllő using EU funds. Assembly of space-lighting and power-transmission systems.
Zollner, Romania
SC KESZ SRL, the subsidiary of KESZ Group in Romania is in charge of the general execution of the production plant of Zollner. The floorspace of the plant is 5000 square metres, the expected finishing date is December 2010.