KÉSZ Közép-Európai Építo és Szerelo Kft.
Home    |    Magyar Deutsch

Project in progress


2010 évi projektjeink


Baumit Bukarest
Baumit Bukarest1

Baumit Bukarest

Construction of a 57 metres tall sand processing tower, a 37 metres tall natural stone building, 1130 t steel structure and 800 t technological structure.

Baumit Bulgaria1
Baumit Bulgaria

Baumit Bulgaria, expansion

Technological expansion of a Baumit tower previously built by KÉSZ Group.

Baumit Bulgaria
Baumit Bulgaria1

Baumit Bulgaria, steel structure

Assembly of a 30 metres tall 90 t burn accelerator steel structure.

Baumit Czech Republic

Baumit, Czech Republic

Expansion of an existing Baumit tower. Building in a 90 t steel structure and construction of a 45 metres long, 60 t silo.

Burger House

Burger house, Szeged

Mechanical and electric assembly works in a scheduled building in the city center of Szeged.

Császár-Komjádi Swimming Pool, Budapest

Császár-Komjádi Swimming Pool, Budapest

The reconstruction of Császár-Komjádi Swimming Pool in Budapest.

Érd DM1
Érd DM2 Érd DM panorama

DM Logistics Hall, Érd

Construction of a 23 000 m2 logistics hall for Drogerie Markt in Érd.

SkyCourt_1
ferihegy_ Ferihegy4 Ferihegy1

Ferihegy Terminal 2, Sky Court

Reconstruction and development works at Budapest Airport Terminal 2A and 2B. The tasks of our company include  preparing the construction plans of the continually operating airport, the demolition and reconstrucion of the existing buildings (Terminal 2A and 2B) and the general construction of the buildings in the airport's monitoring and commercial area, Sky Court.

Hotel City Inn
Hotel City Inn_

Hotel City Inn

Reconstruction and expansion of a hotel in the city centre of Budapest with 71 rooms. The project includes the construction of a new wing to the building.

Kraft Foods - Ukraine

Kraft Foods - Ukraine

A Kraft ukrajnai leányvállalatunkat a KÉSZ UA-t választotta ki új gyáregységük felépítésére az ukrajnai Trostianetsben.  A megbízás egy 15 000 m2-es kekszgyártó-üzem generál kivitelezésére és a kiviteli tervek elkészítésére szól. A projekt kezdőidőpontja előreláthatólag 2010. júliusa, a várható befejezés 2011 március.

nincs kep

LINEA Hall, Győr

General construction of a 2800 sqare metre hall with warehouses, a workshop hall and a social block.

MBMH_légi4
MBMH Office

MBMH Central Office Building

Construction of a 15 000 m2 office building at the industrial site of Daimler-Mercedes in Kecskemét. The office building is the central building of the industrial park.

MBMH_légi3
MBMH ELT épület, Mercedes, MBMH ELT building, Mercedes, Kecskemét

MBMH ELT Building, Mercedes Kecskemét

Construction of an Electric Distributor Center at the industrial site of Mercedes in Kecskemét. The area of the electric distributor center is 1500 m2.

MBMH_légi2
MBMH Lacquering Plant_ MBMH Lacquering plant MBMH Lacquering plant2

MBMH Lacquering Plant

Construction of a Lacquering Plant and Bodywork Warehouse at the industrial site of Daimler-Mercedes in Kecskemét on a 30 000 m2 construction area. The 4500 t heavy steel structure is manufactured by KÉSZ Industrial Manufacturer Ltd.

nostra3
nostra1 nostra2 nostra4

Nostra Cement, Királyegyháza

Technological assembly of a storage hall of a cement factory and the supplier line belonging to it (approximately 3400 t steel structure). 40-50 people work at the assembly.

TISZK

Regional Integrated Vocational Training Centre

Reconstruction of a secondary school in the 11th district of Budapest. The right wing of the school is the building of the Regional Integrated Vocational Training Centre of the South-Buda area. Our task is the  interior reconstruction of the building, mainly electrical and mechanical works.

SZTE Mérnöki1
SZTE Mérnöki2 SZTE Mérnöki3

University of Szeged, Department of Architecture

General construction of the University of Szeged Department of Architecture using 'Best Available Techniques'. An education building with a total floorspace of 3500 m2.

Roshen Chocolate Factory
Roshen Chocolate Factory1

Vinnytsia Sweet Factory

KESZ UA - our subsidiary in Ukraine - has signed a contract with Vinnytsia Sweet Factory (Roshen) to the general execution of a chocolate factory that will be built as a greenfield investment. The site of the execution is Vinnytsia, 300 km-s away from Kiev. Our task is to build an alltogether 60 000 m2 large establishment, which includes a production hall, a five-storey office building and other service buildings.

Waste Management Plant - Ajka

Waste Management Plant, Ajka

Construction works of a hall with 1000 m2 floorspace. The steel structure was manufactured by  KÉSZ Industrial Manufacturer Ltd. The tasks include the assembly of the steel structure,  skinning of the roof and face works.

Waste Management Plant - Kerepes

Waste Management Plant, Kerepes

Expansion of a waste management plant near Gödöllő using EU funds. Assembly of space-lighting and power-transmission systems.

Zollner

Zollner, Romania

SC KESZ SRL, the subsidiary of KESZ Group in Romania is in charge of the general execution of  the production plant of Zollner. The floorspace of the plant is 5000 square metres, the expected finishing date is December 2010.